Old tin off, new Colorbond on
Metal Re-Roofing, Hunter Valley & Newcastle
The old tin comes off, the new Colorbond goes on. A standard house re-roof takes about 2 days, or 3 to 4 if the fascia and gutters are being done too.
On every re-roof the timber gets checked and fixed, the battens are new and every flashing is new. That's where cheap re-roofs cut corners.
- Typical house re-roof
- 2 days
- Typical house re-roof
- With fascia and gutters
- 3–4 days
- With fascia and gutters
- Workmanship warranty
- 7 yrs
- Workmanship warranty
- Free inspection, measure and fixed-price quote, back within 2 days
- Old roof removed and taken away
- Rotten or sagging timber checked and fixed before the sheets go on
- New 40mm top-hat battens
- Colorbond sheets in Corrugated, Trimdek or Klip-Lok, any Colorbond colour
- New flashings throughout, ridge capping and wall flashings done properly
- Fascia, Colorbond quad or half-round gutters and downpipes, if needed
- Magnet sweep for screws, scrap metal taken on completion
Worth knowing
How we do metal re-roofs
We never screw into the old battens
The quickest re-roof is new sheets screwed into whatever's already there. Ours get new 40mm top-hat battens, so the fixings bite into new steel.
Every flashing is new
Reusing old flashings is a common shortcut. It saves time on the day and turns up later as a leak. Every flashing on our re-roofs is new.
A clean site when we leave
Magnet sweep for screws across the yard and driveway, scrap metal gone on completion, and a full clean-up.
On the job
Metal Re-Roofs photos

Rusted tin coming off, new Colorbond going on 
Roof opened up, timber exposed 
Finished re-roof with whirlybirds
Start to finish
How the job runs
- 01
Free inspection, measure and quote
We come out, get on the roof and measure up. The quote is back to you within 2 days, at a fixed price.
- 02
Materials on site
Happy with the quote? We get the materials there. Most jobs start within 1 to 2 weeks.
- 03
Old roof off
The old roof comes off and goes away with us. For tile roofs, tile bins are on site and gone when the new roof is on.
- 04
New roof on
Timber fixed, new battens, new flashings, new Colorbond. A standard re-roof takes about 2 days, or 3 to 4 with fascia and gutters.
- 05
Clean-up
Magnet sweep for screws, scrap metal taken on completion, and the site left clean.
Where we've worked
Metal Re-Roofs near you
Free inspection
Metal Re-Roofs quote
Based in the Hunter Valley, working across the Hunter Valley, Newcastle and Central Coast. Fixed-price quote back within 2 days.
Call 0435 335 466