Skip to content
HVR Pro Metal Roofing

Old tin off, new Colorbond on

Metal Re-Roofing, Hunter Valley & Newcastle

The old tin comes off, the new Colorbond goes on. A standard house re-roof takes about 2 days, or 3 to 4 if the fascia and gutters are being done too.

On every re-roof the timber gets checked and fixed, the battens are new and every flashing is new. That's where cheap re-roofs cut corners.

Typical house re-roof
2 days
Typical house re-roof
With fascia and gutters
3–4 days
With fascia and gutters
Workmanship warranty
7 yrs
Workmanship warranty
Call 0435 335 466

Get a free quote

Step 1 of 4

What do you need done?

Pick as many as apply.

Four quick steps. Free inspection and quote.

What the job covers

Metal Re-Roofs: what's included

Get a Free Quote
  • Free inspection, measure and fixed-price quote, back within 2 days
  • Old roof removed and taken away
  • Rotten or sagging timber checked and fixed before the sheets go on
  • New 40mm top-hat battens
  • Colorbond sheets in Corrugated, Trimdek or Klip-Lok, any Colorbond colour
  • New flashings throughout, ridge capping and wall flashings done properly
  • Fascia, Colorbond quad or half-round gutters and downpipes, if needed
  • Magnet sweep for screws, scrap metal taken on completion

Worth knowing

How we do metal re-roofs

We never screw into the old battens

The quickest re-roof is new sheets screwed into whatever's already there. Ours get new 40mm top-hat battens, so the fixings bite into new steel.

Every flashing is new

Reusing old flashings is a common shortcut. It saves time on the day and turns up later as a leak. Every flashing on our re-roofs is new.

A clean site when we leave

Magnet sweep for screws across the yard and driveway, scrap metal gone on completion, and a full clean-up.

On the job

Metal Re-Roofs photos

  • Rusted old roof sheets beside new Colorbond sheets during a metal re-roof
    Rusted tin coming off, new Colorbond going on
  • Roof opened up mid re-roof showing the timber frame and battens
    Roof opened up, timber exposed
  • Finished light-coloured Colorbond corrugated roof with whirlybirds and hips
    Finished re-roof with whirlybirds
See all our work →

Start to finish

How the job runs

  1. 01

    Free inspection, measure and quote

    We come out, get on the roof and measure up. The quote is back to you within 2 days, at a fixed price.

  2. 02

    Materials on site

    Happy with the quote? We get the materials there. Most jobs start within 1 to 2 weeks.

  3. 03

    Old roof off

    The old roof comes off and goes away with us. For tile roofs, tile bins are on site and gone when the new roof is on.

  4. 04

    New roof on

    Timber fixed, new battens, new flashings, new Colorbond. A standard re-roof takes about 2 days, or 3 to 4 with fascia and gutters.

  5. 05

    Clean-up

    Magnet sweep for screws, scrap metal taken on completion, and the site left clean.

Free inspection

Metal Re-Roofs quote

Based in the Hunter Valley, working across the Hunter Valley, Newcastle and Central Coast. Fixed-price quote back within 2 days.

Call 0435 335 466

Get a free quote

Step 1 of 4

What do you need done?

Pick as many as apply.

Four quick steps. Free inspection and quote.

Call 0435 335 466Get a Free Quote