Skip to content
HVR Pro Metal Roofing

Our most-done job

Tile to Metal Roof Conversions, Hunter Valley & Newcastle

Tile to metal is the job we do most. The tiles come off into bins on site, the timber underneath gets checked and fixed, and a new Colorbond roof goes on with new battens and new flashings.

The tile bins are gone when the new roof is on, and the scrap goes with us when the job is finished.

Workmanship warranty
7 yrs
Workmanship warranty
Colorbond material warranty
10 yrs
Colorbond material warranty
New top-hat battens
40mm
New top-hat battens
Call 0435 335 466

Get a free quote

Step 1 of 4

What do you need done?

Pick as many as apply.

Four quick steps. Free inspection and quote.

What the job covers

Tile to Metal Conversions: what's included

Get a Free Quote
  • Free inspection, measure and fixed-price quote, back within 2 days
  • Tiles stripped, with tile bins on site and gone when the roof is replaced
  • Rotten or sagging timber checked and fixed before the sheets go on
  • New 40mm top-hat battens
  • Anti-con insulation blanket, laid while the roof is open
  • Colorbond sheets in Corrugated, Trimdek or Klip-Lok, any Colorbond colour
  • New flashings throughout, with ridge capping and wall flashings done properly
  • Magnet sweep for screws and a full clean-up

Worth knowing

How we do tile to metal conversions

The timber is the job

Once the tiles are off you can see what's been holding them up. Sagging or rotten timber gets fixed before anything else happens. Sheet over it and the new roof inherits the old problem.

New battens, every time

New 40mm top-hat battens go on every roof. We never screw into the old ones, so every fixing goes into new steel.

No silicone holding it together

Ridge capping and wall flashings are fitted properly, and every flashing on the roof is new. Nothing depends on a bead of sealant.

On the job

Tile to Metal Conversions photos

  • Tiled single-storey home before a tile to metal roof conversion
    Tiled roof, before
  • Roofing crew stripping the tiles off a house roof
    Stripping the tiles
  • Finished light Colorbond corrugated roof
    Finished roof
See all our work →

Start to finish

How the job runs

  1. 01

    Free inspection, measure and quote

    We come out, get on the roof and measure up. The quote is back to you within 2 days, at a fixed price.

  2. 02

    Materials on site

    Happy with the quote? We get the materials there. Most jobs start within 1 to 2 weeks.

  3. 03

    Old roof off

    The old roof comes off and goes away with us. For tile roofs, tile bins are on site and gone when the new roof is on.

  4. 04

    New roof on

    Timber fixed, new battens, new flashings, new Colorbond. A standard re-roof takes about 2 days, or 3 to 4 with fascia and gutters.

  5. 05

    Clean-up

    Magnet sweep for screws, scrap metal taken on completion, and the site left clean.

Also from HVR Pro

Related roofing services

Where we've worked

Tile to Metal Conversions near you

Free inspection

Tile to Metal Conversions quote

Based in the Hunter Valley, working across the Hunter Valley, Newcastle and Central Coast. Fixed-price quote back within 2 days.

Call 0435 335 466

Get a free quote

Step 1 of 4

What do you need done?

Pick as many as apply.

Four quick steps. Free inspection and quote.

Call 0435 335 466Get a Free Quote